Inspection · 2024-10-07
(804) 588-2371
Areas Reviewed
8VAC20-780 Administration
8VAC20-780 Staff Qualifications and Training
8VAC20-780 Physical Plant
8VAC20-780 Staffing and Supervision
8VAC20-780 Programs
8VAC20-780 Special Care Provisions and Emergencies
8VAC20-780 Special Services
8VAC20-820 THE LICENSE.
8VAC20-820 THE LICENSING PROCESS.
8VAC20-820 HEARINGS PROCEDURES.
8VAC20-770 Background Checks
20 Access to minor?s record
22.1 Early Childhood Care and Education
63.2 Child Abuse & Neglect
During the inspection, the inspector reviewed the areas listed above to include standards found out of compliance during the previous inspection. Unless otherwise noted as a violation within this inspection report, the provider was in compliance with the standards reviewed. If there were any serious injuries or fatalities related to a violation, the details will be included in the description of the violation.
Inspector Notes
An unannounced, on-site monitoring inspection was initiated on 10/07/2024 and completed on 10/16/2024. The on-site inspection began at 9:15 am and ended at 10:45 am. The inspector reviewed compliance in the areas listed above. There were 23 children present and 5 staff. The inspector reviewed 5 children?s records onsite and 5 staff records electronically on 10/16/2024.
This inspection included document review, tour of the facility, interviews, observations, and measurements.
Information gathered during the inspection determined non-compliance with applicable standards or law, and violations are documented on the violation notice issued to the program.
Violations
3There was no physical examination in the record of Child #4, who had been enrolled for over 7 weeks.
Staff are to complete the VDOE sponsored online orientation course within 90 days of hire.
Staff #5 completed the course three months late
Where playground equipment is provided, resilient surfacing shall comply with safety standards and shall be under equipment with moving parts or climbing apparatus to create a fall zone free of hazardous obstacles.
The resilient surfacing measured less than an inch at the end of the yellow and purple slides and in multiple places under the equipment. Grass was observed in multiple areas of the fall zones.