Inspection · 2025-02-19
(757) 403-3045
Areas Reviewed
8VAC20-780 ADMINISTRATION.
8VAC20-780 STAFF QUALIFICATIONS AND TRAINING.
8VAC20-780 PHYSICAL PLANT.
8VAC20-780 STAFFING AND SUPERVISION.
8VAC20-770 BACKGROUND CHECKS
8VAC20-820 THE LICENSE.
Inspector Notes
An unannounced, on-site focused monitoring inspection was initiated and completed on February 19, 2205. The on-site inspection began at 7:44 am and ended at 9:28 am. The inspector reviewed compliance in the areas listed above. There were 8 children present and 3 staff including the director. The inspector reviewed 1 staff records on site. This inspection included document review, observations, and interviews.
The information gathered during the inspection determined no violations with applicable standards or law. No violations were issued.
Violations
0No violations found for this inspection.