Inspection · 2025-02-14
(540) 280-0742
Areas Reviewed
8VAC20-790 Introduction
8VAC20-790 Administration
8VAC20-790 Staff Qualifications & Training
8VAC20-790 Physical Plant
8VAC20-790 Staffing & Supervision
8VAC20-790 Programs
8VAC20-790 Special Care Provisions & Emergencies
8VAC20-790 Special Services
8VAC20-780 Administration.
20 Access to minor?s records
8VAC20-780 Staff Qualifications and Training.
22.1 Early Childhood Care and Education
8VAC20-780 Physical Plant.
63.2 Child Abuse & Neglect
8VAC20-780 Staffing and Supervision.
8VAC20-780 Programs.
8VAC20-780 Special Care Provisions and Emergencies
8VAC20-780 Special Services.
8VAC20-820 THE LICENSE.
8VAC20-820 THE LICENSING PROCESS.
8VAC20-820 HEARINGS PROCEDURES.
8VAC20-770 Background Checks
During the inspection, the inspector reviewed the areas listed above to include standards found out of compliance during the previous inspection. Unless otherwise noted as a violation within this inspection report, the provider was in compliance with the standards reviewed. If there were any serious injuries or fatalities related to a violation, the details will be included in the description of the violation.
Inspector Notes
An unannounced, on-site monitoring inspection was initiated on 02/14/2025 and completed on 02/14/2025. The on-site inspection began at 11:14am and ended at 1:40pm. The inspector reviewed compliance in the areas listed above. There were 18 children present and five staff. The inspector reviewed five children?s records and five staff records on-site. This inspection included document review and tour of the facility.
Information gathered during the inspection determined non-compliance with applicable standards or law, and violations are documented on the violation notice issued to the program.
Violations
3There was no physical examination in the record of child #1, who had been enrolled for 18 months.
There was no documentation of monthly evacuation drills for October 2024, November 2024, December 2024.
There was no documentation that the annual lockdown drill had been completed in 2024.