Inspection · 2025-03-07
(757) 404-3063
Areas Reviewed
8VAC20-780 Administration.
8VAC20-780 Staff Qualifications and Training.
8VAC20-780 Physical Plant.
8VAC20-780 Staffing and Supervision.
8VAC20-780 Programs.
8VAC20-780 Special Care Provisions and Emergencies
8VAC20-780 Special Services.
8VAC20-820 THE LICENSE.
8VAC20-820 THE LICENSING PROCESS.
8VAC20-770 Background Checks
20 Access to minor?s records
22.1 Early Childhood Care and Education
63.2 Child Abuse and Neglect
During the inspection, the inspector reviewed the areas listed above. Unless otherwise noted as a violation within this inspection report, the provider was in compliance with the standards reviewed. If there were any serious injuries or fatalities related to a violation, the details will be included in the description of the violation.
Inspector Notes
An unannounced, on-site renewal inspection was initiated and completed on 3/7/25. The on-site inspection began at 10:20am and ended at 1:25pm. The inspector reviewed compliance in the areas listed above. There were 33 children present and six staff. The inspector reviewed five children?s records and three staff records on-site. This inspection included document review, a tour of the facility, interviews, and observations. Information gathered during the inspection determined non-compliance with applicable standards or law, and violations are documented on the violation notice issued to the program.
Please complete the plan of correction (POC) and date to be corrected sections for each violation cited on the violation notice. Specify how the violation will be or has been corrected. Submit your POC within five (5) business days from today, which will be the close of business on 3/21/25. A POC submitted after this date will not appear on the public website.
Violations
3The central registry search of Staff #1 (employed for one month) was requested one week after the employee?s first day of employment. The staff member was observed working alone during the inspection.
The record for Staff #2 (program director, owner) did not include follow-up TB documentation, which is required every two years.
On the day of the inspection, the resilient surfacing was measured at approximately one inch. Children were observed playing on the playground during the inspection.