Inspection · 2025-04-01
(804) 807-3277
Areas Reviewed
22.1 Religious Exempt; Background Checks Code; Carbon Monoxide
32.1 Report by person other than physician
54.1 Must be MAT Certified.
63.2 Child abuse and neglect
8VAC20-770 Background Checks
8VAC20-790 Introduction
8VAC20-790 Administration
8VAC20-790 Staff Qualifications & Training
8VAC20-790 Physical Plant
8VAC20-790 Staffing & Supervision
8VAC20-790 Programs
8VAC20-790 Special Care Provisions & Emergencies
8VAC20-790 Special Services
During the inspection, the inspector reviewed the areas listed above to include standards found out of compliance during the previous inspection. Unless otherwise noted as a violation within this inspection report, the provider was in compliance with the standards reviewed. If there were any serious injuries or fatalities related to a violation, the details will be included in the description of the violation.
Inspector Notes
An unannounced, on-site code compliance inspection was initiated on 4/1/2025 and completed on 4/1/2025. The on-site inspection began at 01:50pm and ended at 3:00pm. The inspector reviewed compliance in the areas listed above. There were fourteen children present with three staff. The inspector reviewed five children?s records and three staff records virtually on 4/4/2025. This inspection included document review, tour of the facility, interviews, and observations.
Information gathered during the inspection determined non-compliance(s) with applicable code sections, and violations are documented on the violation notice issued to the program.
Please complete the plan of correction (POC) and date to be corrected sections for each violation cited on the violation notice. Specify how the violation will be or has been corrected. Submit your POC within five business days from today, which will be the close of business on 4/16/2025. A POC submitted after this date will not appear on the public website.
Violations
2The center did not have the religious exemption certificate posted anywhere in the public vicinity of the building.
The most recent Sworn Statement for Staff #1 was overdue by one month.