Sign in
Back
Pure at Heart Childcare Center, Phase 2

Inspection · 2022-02-08

Date
2022-02-08
Complaint Related
No
Licensing Inspector
Tiffany Jones
(757) 403-3045
SHSIA monitoring inspection of an approved subsidy vendor to determine compliance with current subsidy requirements regarding the health and safety of children and to promote quality standards for the children in their care.
No

Areas Reviewed

8VAC20-780 ADMINISTRATION.
8VAC20-780 STAFF QUALIFICATIONS AND TRAINING.
8VAC20-780 Physical plant.
8VAC20-780 STAFFING AND SUPERVISION.
8VAC20-780 PROGRAMS.
8VAC20-780 Special care provisions and emergencies.
8VAC20-780 SPECIAL SERVICES.
8VAC20-770 Background Checks (22VAC40-191)
22.1 Early Childhood Care and Education

Inspector Notes

This inspection was conducted by licensing staff using an alternate remote protocol, including telephone contacts, documents review, interviews and a virtual tour of the program.

A monitoring inspection was initiated on February 8, 2022 and concluded on February 11, 2022. The director was contacted by telephone and a virtual inspection was conducted. There were 12 children present, ranging in ages from 4 months to age 2, with 5 staff supervising. The inspector reviewed compliance in the areas of administration, physical plant, staffing and supervision, programming, medication, special care and emergencies and nutrition. A total of 2 child records and 2 staff records were reviewed.

Information gathered during the inspection determined non-compliance with applicable standards or law and violations were documented on the violation notice issued to the program.

Violations

1
Standard 8VAC20-780-160-A-2
Based on review of 2 staff records and staff interviews, the licensee did not ensure tuberculosis (TB) documentation shall have been completed within the last 30 calendar days of the date of employment and be signed by a physician, physician's designee, or an official of the local health department.

Evidence: The record for staff #2 did not include TB screening dated within 30 day of employment. TB screening was dated 6-17-2021 and date of employment 1-18-2022.
Plan of Correction: Staff member will achieve a up to date TB screening.