Inspection · 2025-10-20
(571) 596-3660
Areas Reviewed
8VAC20-780 Administration.
8VAC20-780 Staff Qualifications and Training.
8VAC20-780 Physical Plant.
8VAC20-780 Staffing and Supervision.
8VAC20-780 Programs.
8VAC20-780 Special Care Provisions and Emergencies
8VAC20-780 Special Services.
8VAC20-820 THE LICENSE.
8VAC20-820 THE LICENSING PROCESS
8VAC20-820 HEARINGS PROCEDURES
8VAC20-770 Background Checks
20 Access to minor?s records
22.1 Early Childhood Care and Education
63.2 Child Abuse & Neglect
During the inspection, the inspector reviewed the areas listed above to include standards found out of compliance during the previous inspection. Unless otherwise noted as a violation within this inspection report, the provider was in compliance with the standards reviewed. If there were any serious injuries or fatalities related to a violation, the details will be included in the description of the violation.
Inspector Notes
An unannounced, on-site monitoring inspection was initiated and completed on 10/20/2025. The on-site inspection began at 12:21pm and ended at 1:55pm The inspector reviewed compliance in the areas listed above. There were 81 children present and 20 staff. The inspector reviewed 6 children?s records and 3 staff records on-site. This inspection included: document review, tour of the facility, interviews, and observations.
Information gathered during the inspection determined non-compliance with applicable standards or law, and violations are documented on the violation notice issued to the program.
Please complete the plan of correction (POC) and date to be corrected sections for each violation cited on the violation notice. Specify how the violation will be or has been corrected. Submit your POC within five (5) business days from today, which will be the close of business on 10/27/25. A POC submitted after this date will not appear on the public website.
Violations
2Child 1 did not have documentation of additional immunizations once every six months. Last documented immunization was on 2/24/2025.
The drill log provided for August to October did not have the above, required, drill log documentation.