Sign in
Back
Cathedral of Praise Ministries Virginia, Inc.

Inspection · 2024-06-24

Date
2024-06-24
Complaint Related
Yes
Licensing Inspector
Rene Old
(757) 404-1784
SHSIA monitoring inspection of an approved subsidy vendor to determine compliance with current subsidy requirements regarding the health and safety of children and to promote quality standards for the children in their care.
No

Areas Reviewed

22.1 Religious Exempt;
63.2Child abuse and neglect

Inspector Notes

An unannounced inspection was initiated on 06/24/2024 and completed on 07/17/2024 in response to complaints received by the licensing office on 04/25/2024 and 05/13/2024 relating to allegations in the areas of staff-to-child ratio, supervision of children, reporting of suspected child abuse and ensuring all areas of the previses are free of obvious injury hazards.

The inspection included:
*Document review - written policies and procedures;
*Tour of the facility and outdoor play area:
*Interviews with staff;
*Observations.

The preponderance of evidence gathered during the investigation supports the allegation in the area of obvious injury hazards and this part of the complaint is found to be valid. A violation of 22.1-(14.1)-289.031-B-5 is documented on the violation notice issued to the program.

The preponderance of evidence gathered during the investigation does not support the allegations in the areas of staff-to-child ratio, supervision of children and reporting of child abuse therefore, these allegations are determined to be not valid.

Violations

1
Standard 22.1-289.031-B-5
Based on observation, the religiously exempt child day center failed to ensure that all areas of the premises accessible to children are free of obvious injury hazards, including providing and maintaining sand or other cushioning material under playground equipment.

Evidence:
1. There was no cushioning material under any of the outdoor play equipment when the playground was reviewed on 06/24/2024.
Plan of Correction: Administrative staff stated that much had washed away with all of the rain. A new load of much has been ordered and due for delivery within the next few days.
Mulch was delivered and placed under all outdoor play equipment on the afternoon of the inspection - 06/24/2024.