Inspection · 2025-08-07
(540) 216-1434
Areas Reviewed
8VAC20-780 Administration
8VAC20-780 Physical Plant
8VAC20-820 THE LICENSE
8VAC20-820 THE LICENSING PROCESS
8VAC20-820 HEARINGS PROCEDURES
During the inspection, the inspector reviewed the areas listed above to include standards found out of compliance during the previous inspection. Unless otherwise noted as a violation within this inspection report, the provider was in compliance with the standards reviewed. If there were any serious injuries or fatalities related to a violation, the details will be included in the description of the violation.
Inspector Notes
An announced, focused inspection was completed on August 7, 2025.The inspection began at 9:43 AM and ended at 10:35 AM. The inspector reviewed compliance in the areas listed above. This inspection included document review tour of the facility, interviews, observations, and measurements for two yurts.
The information gathered during the inspection determined no violations with applicable standards or law. No violations were issued.
Violations
0No violations found for this inspection.